2013
The company was established in the Jinshan Industrial Park of Luojiang District, Deyang, Sichuan, and is committed to the load bank industry.
2014
Research and develop generator unit load bankes, obtain ISO9001 certification.
2015
Achieve mass production of integrated resistive load bankes and high voltage resistive load bankes.
2016
Develop rack load bankes and start selling them abroad.
2017
Development of battery discharge instruments and electronic load bankes and other series of products.
2018
Development of charging pile load bank
2019
Developed Huawei multifunctional data center load bankes; completed the development of high-voltage 10kV 10MW load bankes for large vessels.
2020
Development of high and low pressure crossover experimental testing platform
2021
Start the layout for the research and development of DC charging modules and ground static power supply products for the aviation system.
2022
1kW dual-phase transformer PCS project research and development
2023
Comprehensive layout of product research and development and market promotion for user and industrial and commercial energy storage systems, as well as wind and solar grid adaptability testing systems.